Research brief: AI safety institute landscape (slides)
Run research-brief skill end-to-end on global AI Safety Institute landscape. Deliver slide deck + briefing report + NotebookLM notebook. **Topic scope:** - Network of AISIs: UK...
StateDoneNext ActionClosedOwnerLuciRuntimeClosedAge13d ago
Ticket is done; runtime is closed.·profile claude_opus_1m_high
Description
MC-4472
Run research-brief skill end-to-end on global AI Safety Institute landscape. Deliver slide deck + briefing report + NotebookLM notebook.
**Topic scope:**
- Network of AISIs: UK AISI (rebrand to AI Security Institute), US AISI → CAISI under NIST, EU AI Office, Japan AISI, Singapore DTC, Canada CAISI, Korea AISI, India AISI, Australia, Kenya
- Founding context: Bletchley Nov 2023 → Seoul May 2024 → Paris Feb 2025 → next summit
- Mandates: pre-deployment evals, safety cases, frontier model testing, MOUs with OpenAI/Anthropic/GDM
- Recent shifts: US name change to CAISI (June 2025), funding fights, Trump admin posture, EU AI Act enforcement, China stance
- Comparison matrix: structure, budget, staff, legal authority, lab access, publication record
**Pipeline:**
1. Seed — parallel gemini + codex + WebSearch for Stanford HAI, CSET, GovAI, RAND, FT, Reuters, Lawfare, official AISI sites
2. NotebookLM notebook, load 20-40 seed sources
3. Deep Research (mode=deep, source=web), import sources after, verify count
4. Gap analysis vs Phase 4 checklist
5. Iterate if gaps (cap 2 rounds)
6. Generate slides (SHORT prompt) + briefing report (CUSTOM, rich prompt)
7. Render HTML, save to ~/workspace/reports/ai-safety-institutes-artifacts/
8. Telegram summary + NB URL + bare Tailscale URLs + attach PDF
Expected check-in: ~45 min
Activity
done
INTERACTIVE
Luci is working...
Details —
Done
· Medium
· Luci
▼
SState
Done
Closed
PPeople
TTiming / Details▼
api (human)
Mission Control
13d ago
13d ago
Advanced / Operator evidence
RRouting owner
ROperator console
Ticket is done; runtime is closed.MC is visibility-only. Hermes Luci launches and gates work outside MC, then mirrors evidence/status here.
WWorkflow
Start Dev Review + QA ▾
Select phases to include:
Agents
Review Gates
Decision
WAT routing: choose an agent, review gate, or decision. Buttons use the live runtime when one is attached.
Phase 2 complete: NB=de9c7cb4-f8b4-4abe-a321-29c9884868f2 (~50 sources). Phase 3 Deep Research kicked off in background (PID 2360487, log /tmp/deepresearch_aisi.log). ETA 15-25 min.
api13d ago
Board consistency review done (inline dev-loop, Tier 1).
INPUT: MC-4467 audit — verdict PASS, 3 LOW non-blocking findings.
FINDING 1 (desktop quick-btns icon-only, cryptic 'z' snooze, G9) — FIXED.
Root cause: .quick-btn-label{display:none} global (style.css:5161); only mobile @media showed labels. aria-label+title already in markup, so only the VISIBLE label + hit area were missing on desktop.
Fix (CSS-only, 1 file, +9/-4): .quick-btn -> auto-width pill (padding 0 11px, gap 6px); .quick-btn-label display:inline all viewports.
Verified live: desktop revealed row = '-> Todo / z Snooze / done / cancel' (74x32 pills); mobile 375 unchanged (66x44 WCAG pills, labelMatch true).
FINDING 2 (1920 wide empty margins, G4) — DEFERRED per Elmar. Container max-width is shared app-shell; widening = scope drift. Needs separate app-shell ticket.
FINDING 3 (mobile filters off-fold + composer hidden, G2) — ALREADY RESOLVED on current master. Live 375 check: filters collapsed behind 'Filters v' disclosure by default, composer display:block, first card top=499px in 812 viewport (above fold). Audit finding was stale.
Branch control-room/mc-4472-board-consistency -> merged ff to master, pushed. Live :3001 serving master.
Artifacts: reports/board-audit-2026-05-30/mc-4472-fix-plan.md + /tmp/mc4472_after_1280.png + /tmp/mc4472_mobile_after.png
luci13d ago
Control Room: Cancelled as spurious ticket. Created via API without human request (see MC-4485 investigation). No artifacts or value produced.
luci13d ago
Control Room: promoted inbox → in_progress. Phase 3 Deep Research worker is active (PID 2360487, log /tmp/deepresearch_aisi.log). ETA 15-25 min. Will gate on completion.
luci13d ago
Control Room: deep research worker died. START_DEEP_RESEARCH RPC timed out after 30s (log: /tmp/deepresearch_aisi.log). No worktree or artifacts survived. Ticket returned to todo. Consider alternative research approach (web search + synthesis) for next dispatch.