## Goal Baseline Iris/Life Manager notification emitters and current notification volume before we change behavior. ## Context Elmar approved the phased Iris/Life Manager atten...
StateDoneNext ActionClosedOwnerLuciRuntimeClosedAge1d ago
Ticket is done; runtime is closed.·profile claude_opus_1m_high
Description
MC-5003
## Goal
Baseline Iris/Life Manager notification emitters and current notification volume before we change behavior.
## Context
Elmar approved the phased Iris/Life Manager attention redesign. This is Ticket 1 from the living plan.
Plan:
http://100.118.207.3:3001/md-view?file=/home/lucienne/workspace/docs/plans/2026-06-11-iris-life-manager-attention-plan.md
Council synthesis:
http://100.118.207.3:3001/md-view?file=/home/lucienne/workspace/docs/plans/2026-06-11-iris-life-manager-attention-council-review.md
## Scope
Phase A1-A2 only:
- Inventory all known Iris/Life emitters and their delivery paths.
- Confirm which jobs can send Telegram/origin messages.
- Check whether a send-log exists.
- Measure or estimate current messages/day by source/emitter from available logs/task runs.
- Classify each emitter as one of: `gate_now`, `downgrade_now`, `critical_only`, `leave_alone`, `unknown`.
- If no send-log exists, specify the smallest append-only instrumentation change as a follow-up, but do not implement it unless trivial and clearly in-scope.
## Acceptance criteria
- All known Iris/Life emitters are listed.
- Current message volume is measured or estimated by source.
- Existing logging/instrumentation status is documented.
- Recommended first noise-reduction targets are identified.
- The living plan progress tracker and phase gate log are updated before closing.
## Constraints
- Read-only unless adding a tiny instrumentation note is explicitly chosen as follow-up.
- Do not change notification behavior in this ticket.
- Do not create future phase tickets beyond the approved Phase A tickets.
Expected check-in: 2026-06-12 12:00 SAST
Activity
done
INTERACTIVE
Luci is working...
Details —
Done
· High
· Luci
▼
SState
Done
Closed
PPeople
TTiming / Details▼
api (human)
Mission Control
1d ago
1d ago
Advanced / Operator evidence
RRouting owner
ROperator console
Ticket is done; runtime is closed.MC is visibility-only. Hermes Luci launches and gates work outside MC, then mirrors evidence/status here.
WWorkflow
Start Dev Review + QA ▾
Select phases to include:
Agents
Review Gates
Decision
WAT routing: choose an agent, review gate, or decision. Buttons use the live runtime when one is attached.
[visibility-only] Queued message recorded for Hermes Luci. MC did not claim the ticket or spawn a runtime.
luci-board-manager1d ago
Visibility-only routing update: created internal Kanban card t_62530df3 for the MC-5003 Iris/Life notification-emitter baseline in isolated worktree /home/lucienne/workspace/_mc_internal_worktrees/MC-5003-iris-baseline and dispatched it to codexbuilder. Verified task status=running, run=295, pid=2546460, cwd=/home/lucienne/workspace/_mc_internal_worktrees/MC-5003-iris-baseline. MC remains visibility-only; no MC runtime/pickup/send/harvest endpoints were used.
luci-board-manager1d ago
Controller gate: internal Kanban t_62530df3 completed the Iris/Life emitter baseline. Verified the living plan contains the 2026-06-11 phase gate, A1/A2/A6 checked, MC-5003 done marker, `life-manager-scan = gate_now`, and the send-log gap. Closing MC-5003 with no behavior changes. Next slice is MC-5004.