You're offline — showing cached data

MC-4495

Planner gate — Control Room v2 implementation plan
2026-06-13 10:05:16 SAST
Home Board MC-4495

Planner gate — Control Room v2 implementation plan

Planner gate for MC-4494: produce the implementation plan for Control Room Operating Model v2 rollout. Scope: - Read canonical docs: /home/lucienne/workspace/mission-control/do...
State Done Next Action Closed Owner Luci Runtime Closed Age 13d ago
MC-4495
Ticket is done; runtime is closed. · profile claude_opus_1m_medium · cwd /home/lucienne/workspace/mission-control · uptime 12d 19h · last activity 12d 16h ago

Description

MC-4495
Planner gate for MC-4494: produce the implementation plan for Control Room Operating Model v2 rollout. Scope: - Read canonical docs: /home/lucienne/workspace/mission-control/docs/control-room-operating-model.md - Read visual explainer: /home/lucienne/workspace/mission-control/static/reports/control-room-interactive-explainer.html - Convert Elmar's approved direction into a concrete implementation sequence. Must include: - Phases/tasks in safe order. - Likely files/modules to inspect or modify. - Acceptance criteria for each phase. - Which role/gate owns each phase: Controller, Planner, Designer, Coder, Reviewer, Tester, Validator. - Verification steps and rollback notes. - Explicit reminder that runtime guidance is advisory; controller may override with any fitting capability. Output: - Planner handoff comment on this ticket and umbrella ticket. - Do not implement code in this planning gate. - Expected check-in: 2026-05-31 16:33:05 UTC.

Activity

done
Luci is working...
Live
No activity yet
Help