You're offline — showing cached data

Luci · Look at diffs to understand the changes.

runtime not set · chat:542:session · failed
×
Luci
Look at diffs to understand the changes.
Luci
This is MC-4412 Home-signoff polish work — uncommitted UI. Check template + test diffs, and MC-4412 ticket state.
Luci
Coherent MC-4412 Home-signoff work. Check MC-4412 ticket state to confirm ownership.
Luci
MC-4412 actually = piano ticket. The CSS comment "MC-4412 Home signoff" mislabels. Find the real Home-signoff ticket.
Luci
MC-4412 label in CSS is mislabeled — real work builds on shipped Home redesign line (4370→4398→4399, all done/luci). Coherent Luci-owned Home chat-first polish, interrupted before commit. Test updated to match code. Verify repo topology + MC running.
Luci
Topology clear: `mission-control` is its own repo (live checkout on master), pool-0 is a separate workspace-repo worktree. The dirty UI work lives in the live MC checkout — already being served (MC up, 200). This is recovery of interrupted Luci Home-polish work. Need: validate render (desktop + 375px), run modified test, commit+push in mission-control. Invoking dev-loop first (mandatory pre-commit).
Luci
Classified: **Tier 2 UI recovery**. Work already written + coherent; my job = validate + commit. UI → both gates required (QA test + Tessa 375px APPROVED). Step 1: QA gate — run modified test in live MC repo.
Luci
19 passed (incl. renamed fallback-to-ticket test). QA gate 1 ✓. Step 2: Tessa gate — real-browser desktop + 375px verdict on live Home polish.
Default runtime
Help